Details
-
Task
-
Status: Open (View Workflow)
-
Major
-
Resolution: Unresolved
-
None
-
None
-
None
Description
Hi,
The slave should report the replication connection name to the master and the master should display this in SHOW SLAVE HOSTS.
This way, tools like pt-table-checksum are able to pinpoint to the right replication connection.
Thank you,
Michaël
Attachments
Issue Links
- relates to
-
MDEV-40061 Provide an automatic way to access slave's Information schema.slave_status table from the master
-
- Open
-